Project Management Division  |  Hydraulic-Barracks Sidewalk
brown-horizontal-line

Hydraulic Road and Barracks Road Sidewalk Improvements

The Hydraulic Road sidewalk construction will take place on the north side of Hydraulic Road between Commonwealth Drive and Georgetown Road. The Barracks Road sidewalk construction will take place from the Barracks West apartments to the existing sidewalk west of Georgetown Road on the north side and between Georgetown Road and between Out of Bounds Road and Westminster Road on the south side.

A Design Public Hearing took place on Wednesday, January 28, 2015 from 6:30pm - 8:30pm at the Jack Jouett Middle School cafeteria to provide information and receive public comments related to this project. Materials from the event are available for download:
Presentation | Pamphlet | Plan view of the Hydraulic sidewalk improvements | Plan view of Barracks West sidewalk improvements |Plan view of Barracks sidewalk improvements at Georgetown and at the Bypass

Following is a map illustrating where the improvements will take place and the forecasted schedule for the project:

PHASE FORECASTED 
SCHEDULE
Public Hearing January 2015
Right-of-Way Authorization October 2015
Right-of Way Acquisition Completed September 2017
Ad for Construction June 2017 (re-bid)
Construction Activities November 2017
Targeted Construction Completion June 2018

 

 


 
 
 